[[ImgSrc-topCode]]
Vertical Man Lift
video
Vertical Man Lift

Vertical Man Lift

CUP double aerial work platform is a special mechanic installation used in high operations. This installation is small in scale, light in weight, convenient and quick in moving, safe and reliable in elevation operation, suitable for use in room fitting-ups, like in hotels, restaurants,s and bazaars, electronic wire and pipelines fixings in a high place, door and window maintenance, cleaning, exhibition arrangements in high space, etc. It is also suitable for high operations in those narrow spaced working rooms. So we say that it can satisfy those special needs of the customers.
Send Inquiry
Chat Now
Description

Shandong Cathay Machinery Co., Ltd. is one of the most experienced manufacturers and suppliers of vertical man lift in China. We warmly welcome you to buy discount vertical man lift for sale here from our factory. Quality products and reasonable price are available.

 

Dual Mast 10~16m 2-person Vertical Mast Lift 

Cathaylift 5~16m 150kg~300kg load High-configuration double mast aluminum aerial work platform adopts high-strength and high-quality aluminum alloy material, which has the advantages of beautiful appearance, small size, lightweight, balanced lifting, safety, and reliability. Double mast lifting equipment is very convenient to push and go up and down, and it can pass through general halls and elevators.

cathaylift dual mast vertical aerial work platform-Shandong Cathay Machinery Co Ltd 1

Model No.

CUP-6DH

CUP-8DH

CUP-9DH

CUP-10DH

CUP-12DH

CUP-14DH

CUP-16DH

Max.Platform Height

6m

8m

9m

10m

12m

14m

16m

Max Working Height

8m

10m

11m

12m

14m

16m

18m

Load Capacity

300kg

300kg

250kg

250kg

200kg

200kg

150kg

Platform Size

1.45*0.7m

1.8*0.7m

Occupants

Two people

Outrigger Coverage

2.45*1.75m

2.7*1.8m

Overall Size

1.45*0.81*1.99m

1.88*0.81*2.68m

Net Weight

610kg

645kg

680kg

715kg

750kg

892kg

996kg

Motor Power

1.5kw

Options

DC

2x12v

DC Motor

2.2kw

Charger

12v15A

Products Details

cathaylift dual mast vertical aerial work platform-Shandong Cathay Machinery Co Ltd 2

cathaylift dual mast vertical aerial work platform-Shandong Cathay Machinery Co Ltd 3

cathaylift dual mast vertical aerial work platform-Shandong Cathay Machinery Co Ltd 4

 

Performance

The platform adopts hydraulic pressure and chain lifting mechanism, its frame is welded by using rectangular steel pipes, and its elevation standing pillars are made by using high-strength aluminum alloy, so to make its mechanism compact, safe, and reliable. There are two operation button controls one on the lifting operation platform and the other on the downside of the platform, and both of them adopt the safe voltage. The position of the up-lifting limit is controlled by the space limit block; its lifting draw is safe for its elevation standing pillar uses the double chain to draw the lift. In conclusion, the whole mechanism is reasonably excellent and reliable.

cathaylift dual mast aerial work platform-Shandong Cathay Machinery Co Ltd 4

Safety Warning

1. During operation, the wind speed should not exceed 5.5 m/s (class 4). Operation is strictly forbidden in storming and lightning environments. The operation can be started only after the installation is well placed on even and solid ground and well-level adjustment.
2. When used, all four legs must be fully extended out and steadily contacted to the ground, and the operation can be only started after the four indication lamps light on.
3. During operation, the body of the operator must be kept within the platform handrails, any additional matter like a ladder or steps cannot be installed to increase the climbing height, and the operator’s feet must be steadily stepped on the footboard. It is not allowed to pile other materials at the foot of the rails.
4. When operating the AC machinery, an extended wire larger than 15 amperes should be used.
5. The plug should be inserted into the socket with ground wire.
6. Operation should not be overloaded.
7. When moving the platform, descend the rails to the lowest position, then draw back its supporting legs, and only at this time, the moving can be started
8. When the platform is installed in a place with a slope less than 5 degrees, the operation should be done by two men in cooperation, and the working rails must face the direction of the downslope. If the slope succeeds by 5 degrees, transportation should be with an aiding forklift.
9. When the platform has been stored for a long time, before use, operation with empty loading should be carried out for several times, only when everything is confirmed regular, can it be put into operation.
10. Operation area should be far away from the high-pressure cable (see attached table) and other obstacles that will hinder safe operations.

Real Order

cathaylift dual mast aerial work platform-Shandong Cathay Machinery Co Ltd 14

cathaylift dual mast aerial work platform-Shandong Cathay Machinery Co Ltd 15

cathaylift dual mast aerial work platform-Shandong Cathay Machinery Co Ltd 16

 

Hot Tags: vertical man lift, 45 foot articulated boom lift, Single Person Man Lift, Push Around Vertical Lift, Aerial Platform Lift, Portable Man Lift, Push Around Mast Lift

Send Inquiry

(0/10)

clearall